Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Kerb repair
Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road.
Roof repair
Our reactive maintenance team attended a commercial property in order to repair a flat roof after water ingress and been noticed.
Step nosing
Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.
Manhole repair
Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Removal of graffiti
Our reactive maintenance team attended a commercial premises to remove graffiti that had little artistic merit.
Light installation
Our planned maintenance team attended an industrial centre to Install 3 PIR sensor lights