Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Bracket replacement for screens shielding car park
Our planned maintenance team attended a car park at a commercial centre in order to replace the brackets holding in place the shielding screens for the multi storey car park.
Lock replacements
Our locksmith attended a commercial office in order to replace locks in the building
Line marking retail park
Our planned maintenance team attended a retail park out of hours and completed an extensive line marking exercise
Installation of barbed wire
Our reactive maintenance team removed damaged barbed wire and broken brackets from a barbed wire fence in order to mitigate a security risk.
Emergency boarding up
Our reactive team attended an industrial park in order to board up broken windows of an empty unit which represented a security risk
Installation of fire exit signs
Our planned maintenance team attended a car park in order to install fire safety signs in response to a fire risk assessment.