Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Picnic facilities
Our reactive maintenance team attended a commercial premises in order to urgently install a picnic table so that people were able to take advantage of the weather.
Replacement of kerbs stones and paving slabs
Our planned maintenance team went to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard...
Fabrication and replacement of swing gate
Our planned maintenance team attended an industrial centre for fabrication and replacement of a swing gate
Kerb repair
Our groundworks team attended a commercial centre in order to repair damaged kerb stones on an access road.
Roof repair
Our reactive maintenance team attended a commercial property in order to repair a flat roof after water ingress and been noticed.
Step nosing
Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.