Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Decoration
Our team attended a residential flat in order to redecorate the living room prior to the next tenant moving in
Provision of cycling resources
Our planned maintenance team attended a commercial office building to supply and install a freestanding compact public bike pump.
Replacement of Drains
Our planned maintenance team attended a retail park to replace a damaged ACO channel.
Ice-cream van damage repair
Our groundworks team attended a retail park in order to repair a bollard and loose payment slabs damaged by an ice cream van.
Electrical repair
Our planned maintenance team attended a corporate gym in order to replace the gym floor.
Sticking door
Our reactive maintenance team attended a retail site in order to repair a sticking door that had swollen due to the bad weather.