Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Manhole repair
Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Removal of graffiti
Our reactive maintenance team attended a commercial premises to remove graffiti that had little artistic merit.
Light installation
Our planned maintenance team attended an industrial centre to Install 3 PIR sensor lights
Bracket replacement for screens shielding car park
Our planned maintenance team attended a car park at a commercial centre in order to replace the brackets holding in place the shielding screens for the multi storey car park.
Lock replacements
Our locksmith attended a commercial office in order to replace locks in the building
Line marking retail park
Our planned maintenance team attended a retail park out of hours and completed an extensive line marking exercise