Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment