Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Replacement of leaking auto air vents
Our commercial plumbing team attended a medical centre where water leakage had been observed.
Health & Safety Repairs at Retail Park
Our reactive maintenance team visited a retail park where a number of minor Health and Safety issues had been raised.
Water Ingress
Our preventative maintenance team visited a commercial building in central London that had experienced a number of water ingress issues.
Road lining at retail park
Our planned maintenance team visited a retail park in order to repaint faded road markings.
Replacement concrete bollards
Our groundworks team attended a Midlands industrial estate in order to repair damaged concrete bollards.
Fire door replacement
Our reactive maintenance team attended a West End office building in order to replace a fire door.