Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Access door repair
Floor spring and bottom shoe replacement of door
Re-lay of slabs
Two man groundworks team attended a central London commercial location.
Replacement of manhole cover
Our groundworks team attended an industrial estate in order to replace a gas cover.
Decorating of investment property
An investment property as part of a client portfolio was attended by our planned maintenance team.
Repair of fire escape gate
Our reactive maintenance team attended an industrial park in order to repair a gate that was unable to open - the gate also acts as a fire escape route
Larger bird boxes!
We returned to a commercial site where previously bird boxes had been installed in order to install some roomier boxes to cater for the larger bird!