Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Installation of Palisade fencing
Our planned maintenance team installed a palisade fence in order to prevent fly tipping at an industrial site.
Gutter Cleaning
Our planned preventative maintenance team attended in order to clear gutters on a business park.
Roof inspection and repair
Our commercial roofing team travelled to The Midlands to inspect and repair a roof suffering from water ingress.
Replacement of faulty lights
Our electrical team attended an emergency call out and replaced faulty lights.
Brickwork at retail centre
Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report.
Car park Lining
Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material to form markings.