Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.