Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Fire door replacement
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Fire stopping
Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment.
Replacement of glass on 3 story building
Our working at heights planned maintenance team cut out glazing from 3rd floor.
Refurbishment of fence rail / sub station and block paving
Our planned maintenance team attended a retina site and renewed the wooden knee rail fence...
Groundworks business centre
Our groundworks team attended site - lifted areas of dropped and risen block paving that had created a trip hazard in the car park...
External decoration of retail complex
Our planned maintenance team were asked to refresh and decorate a normally busy thoroughfare in a retail complex