Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Installation of solar bollards
Following a health and safety review our groundworks team attended an industrial site and installed solar powered bollards.
Gully and drain cleaning
As part of a planned maintenance programme our team visited a commercial building and cleared all act channels and covers, all gutters and other floor drainage.
Refurbishment of flat
Refurbishment of a residential flat above commercial for an investor
Emergency patchwork repairs to roof
Following heavy rains our reactive team attended a commercial building to provide emergency patchwork repairs using liquid resin to a flat roof to prevent short term water ingress.
Line Marking
Our groundworks team attended following a health and safety review and improved the marking for pedestrians in a commercial carpark.
Digital Lock
We attended site following a fire risk assessment and fitted a digital lock to the common parts electrical riser.