Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Relay paving stones
The groundworks team attended a retail park where damaged paving stones represented a trip hazard and relaid.
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .
Wall construction and handrail replacement
Our groundworks team visited an industrial park in order to reconstruct a damaged wall and replace and reattach a handrail.
Health and Safety Job
Following a health and safety survey our preventative maintenance team were asked to highlight potential hazards at a commercial building to reduce the risk of accidents.
Decoration
Out of hours planned maintenance of stud wall construction and paining to improve the layout of office in a commercial building.