Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Fitting of Hand Dryer
Fitting of a new hand dryer in ladies tiles of office as part of a refurbishment.
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.
Installation of wooden fence replacement
Carpentry and security requirement - installing a wooden fence to prevent access to the site through a hedge by third parties.
Refurbishment
Refurbishment of central London office as part of a planned maintenance schedule. Decorating of walls and all wood.
LED Installation
Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.