Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Fitting of motion sensor and external light
Planned preventative maintenance, electrical installation. Fitting motion sensors and an external light to the rear of a commercial office to increase security for staff and visitors.
Fence Repair
Repair of fence that was presenting a health and safety hazard.
Liquid resin treatment
Liquid resin treatment to fascia and gutter
Electrical Repair of Entrance Control
Reactive maintenance to repair entrance control to office car park to ensure no security problems.
Installation of Protective Bollards
Planned maintenance work to install parking bollards to act as a safety barrier to prevent health and safety risk to pedestrians.
Painting of Hoarding Board
Painting of a security hoarding