Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme
Replacement of Lighting in Car Park
Reactive maintenance to restore lighting in carpark in order ensure security and health and safety on compromised.
Thermoplastic road markings
Application of thermoplastic road markings
Roof Repairs
Reactive maintenance commercial roof repair involving the sealing of up stands and joints in roof felting due to a roof leak.
Resetting of granite setts
Resetting of granite setts and road resurfacing on roadway at office building complex as part of planned preventive maintenance.
Installation of steel bollards
Installation of steel bollards to separate pedestrians at retail centre.