Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Installation of fabricated gate and fence
Fabrication of gates and fencing at industrial complex to enhance security as part of planned preventive maintenance programme.
Installation of LED floodlights
Electrical Installation of 6 LED floodlights at office complex as part of planned preventative maintenance programme.
Servicing and repair of entrance doors
Reactive servicing and repair of entrance doors to office to ensure security maintained.
Installation of speed bumps
Installation of speed bumps in office carpark as part of planned preventative maintenance following health and safety review
Cleaning and repair of shop front
Cleaning and repair of shop front of retail unit as part of reactive maintenance response.
Brickworks
Repair and Replacement of Brickworks