Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.
Health and Safety Inspections
It is important that all ladders are inspected on a regular basis.
Gate Reinstatement
Reinstatement of gate at industrial park.
Fire Doors
Installation and upgrade of fire doors.
Carpet Cleaning
Deep cleaning a carpet is often as effective as a replacement.
Repair of Pathways and Roads
Repair of pathways and roads at medical centre.