Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Bollard Repair
Repair of damaged raised bollard.
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.
Refresh of external entrance areas
Pressure washing and sealing of cracks can give external areas an aesthetic uplift.
Rubbish Removal
It is important that fly tipping or other on site eye sores are removed as quickly as possible.