Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Commercial Building Refrubishment
Complete external refurbishment of 4 story commercial building.
Entrance Doors
Installation of entrance doors to ensure good first impressions of commercial office building.
Bollard Installation
Installation of bollard to protect pavement.
Height Restrictor
Repair of height restrictor.
Drone Survey
Drone survey of residential flat roof to check for source of water ingress.
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?