Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.
Replacement Door Handle
Emergency replacement of door handle.