Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Emergency Glass Replacement
Emergency glass replacement for entrance door.
High Level Gutter Clearance with Spider Boom
Clearing high level gutters of a commercial office in order to prevent water ingress problems in the future using a C230 Spider Boom.
Fitting of solar reflective film
Fitting of solar reflective solar film to external windows of commercial building in order to reduce air conditioning requirements leading to substantial costs savings and increased building energy efficiency.
External Painting and Refurbishment of Commercial Offices
Large scale refurbishment of commercial offices in Kensington including - painting, window refurbishment and pointing.
Door Frame Repair
Quality carpentry and painting can make woodwork look just like new even after a break in.
Removal of bird waste from flat roof.
Removal of bird waste from flat roof.