Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.