Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Wall repair
Our groundworks team attended a commercial office building in Chelsea in order to repair a wall leading to the entrance of the building.
Electric access gate repairs
Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
Relaying trip hazards
Our groundworks team attended an industrial site where a health and safety report had indicated that some paving slabs were a potential trip hazard.
Faulty access door
Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door.
Decoration and refurbishment
Our decorating team attended a commercial office building north of Oxford Street The team prepared and redecorated a number of washrooms
Refurbishment
Our decorating team attended an office building in order to refurbish all landlord parts including bathrooms.