Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.
Groundworks
The groundworks team attended a business park in order to re-lift uneven slabs, throw away broken ones as required and relay slabs
Decoration
Our refurbishment team attended an office building in order to refurbish a board room.
It’s getting to feel a lot like Christmas…
Our electrical team attended a retail park and installed commando sockets in the lampposts along the entry drive way in anticipation of the installation of Christmas lights