Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Groundworks
Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.
Plumbing – Drainage
Drainage team attended residential property that had severe drain blockages.
Groundworks
Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.
Electrical
Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.
Installation of Lightweight Steel Frame external walling residential block
Installation of the SFS infill external walls before fitting the fire rated cladding and insulation.