Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Gully and drain cleaning
As part of a planned maintenance programme our team visited a commercial building and cleared all act channels and covers, all gutters and other floor drainage.
Refurbishment of flat
Refurbishment of a residential flat above commercial for an investor
Emergency patchwork repairs to roof
Following heavy rains our reactive team attended a commercial building to provide emergency patchwork repairs using liquid resin to a flat roof to prevent short term water ingress.
Line Marking
Our groundworks team attended following a health and safety review and improved the marking for pedestrians in a commercial carpark.
Digital Lock
We attended site following a fire risk assessment and fitted a digital lock to the common parts electrical riser.