Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Installation of speed bumps
Installation of speed bumps in office carpark as part of planned preventative maintenance following health and safety review
Cleaning and repair of shop front
Cleaning and repair of shop front of retail unit as part of reactive maintenance response.
Brickworks
Repair and Replacement of Brickworks
Take up decking – repair roof – clear gutters – replace decking
Take up decking - repair roof - clear gutters - replace decking.
Installation of roof railing
Installation of roof railing following health and safety review.
Installation of stair nosing
Installation of stair nosing at retail centre to prevent health and safety hazard.