Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.
Health and Safety Inspections
It is important that all ladders are inspected on a regular basis.
Gate Reinstatement
Reinstatement of gate at industrial park.
Fire Doors
Installation and upgrade of fire doors.
Carpet Cleaning
Deep cleaning a carpet is often as effective as a replacement.
Repair of Pathways and Roads
Repair of pathways and roads at medical centre.







