Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.
Gutter Clearance
It is obviously important that gutters are kept clear in autumn to prevent water ingress.
Fire Strips
Installation of intumescent strips on fire doors post a Fire Risk assessment.