Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.
Replacement Door Handle
Emergency replacement of door handle.