Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Clearing Roof
Clearing of debris from roof of commercial building preventing water ingress and damage.
Highlighting
Highlighting of potential hazards post a health and safety assessment.
Installation of New Glass Canopy
Installation of new glass canopy over commercial building entrance.
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.
Speed Limit Sign
Installation of speed limit sign to ensure safe traffic flows at industrial site.