Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.

RECENT JOBS

Bike Racks

Installation of bike racks at Richmond office - New bike racks installed so as the tenant could encourage cycling to work saving parking costs.

2020-05-17T13:55:38+02:00
Go to Top