Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Decorating
Decorating team attended office building and redecorated and refreshed the communal areas.
Gates-Security
Attended industrial estate.... built new base for gate bollard to sit on using concrete
Groundworks
Attended retail car park and removed damaged bollards. Supplied and fitted new concrete bollards.
Decorating
Attended commercial office and prepared areas for decorating.
Flat Roof Works
Attended commercial building and carried out roof repairs. Added extra pipework to divert water, repaired flashing and coated entire flat roof with liquid rubber.