Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.