Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.