Groundworks Retail Park

Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS

Return to Previous Page

RECENT JOBS

Load More Posts
2019-07-09T15:31:51+02:00