Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment