Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS

RECENT JOBS

Fencing

Our reactive maintenance team attended site in order to repair and replace damaged fencing where an HGV had knocked it down.

2022-02-14T18:49:41+02:00
Go to Top