Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Canteen refurbishment
Our refurbishment team attended the canteen of a commercial premises.
Damaged wall due to plant growth
Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall.
Refurbishment
Planned maintenance of stairwell of commercial building.
Clearance of fire escape
In response to a Fire Risk Assessment our reactive maintenance team attended an industrial site.
Hand sanitiser installation
Our preventative maintenance team installed hand sanitiser and signage throughout a commercial premises to ensure that health and safety guidance relating to the corona was followed and the premises were COVID-19 SECURE .
Corona signage and sanitiser stations
Our preventative maintenance team attended a commercial premises in order to install signage and hand sanitiser stations to ensure that the premises with the health and safety guidance as regards the corona.