Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Refurbishment
Our refurbishment team attended and replaced missing plasterboard and filled as required and painted entire wall in white emulsion.
Brickwork Repair
Following the identification of a pillar in disrepair our reactive maintenance team attended site. They toothed out all broken brick work in the pillar and re-layed new bricks to rebuild the pillar.
Ground works post H&S review
Our groundwork team attended to repair broken paving slabs. This was following a heath and safety review which had identified them as slip hazards.
FRA Response
Our maintenance team attended a central London office to deal with recommendations post a Fire Risk Assessment. One of which was to relocate the fire extinguishers.
Groundworks
Our groundworks team reset and concreted in two bollards at an industrial site where HGVs had been colliding with the bollards previously.
Electrical Works
Our electrical installation team were asked to attend a business park to check the installation of a number of internal and external LED lights.