Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.
Groundworks and road lining
Planned maintenance at industrial park including groundworks, line marking and signage.
Decorating
Planned maintenance to decorate the lobby area of an office due to wear and tear.
Maintenance of conservatory roof glazing
Planned maintenance of conservatory roof glazing at an office
Refurbishment of office lavatories
Planned maintenance - Refurbishment of toilets in office due to rising damp.