Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS

RECENT JOBS

Doors

Reactive maintenance to ensure that security isn’t compromised due to frame coming away from external door.

2022-02-14T18:49:41+02:00
Go to Top