Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Refurbishment of Fire Exit
A planned maintenance job in response to a fire risk assessment.
Tarmac Repair
Planned maintenance in response to a health and safety review.
Clearing of Moss and Algae
Planned maintenance in response to health and safety review.
Groundworks Retail Park
Planned maintenance including groundworks, signage and drains.
Health and Safety Survey Response
Planned maintenance in response to a health and safety survey.
Groundworks and road lining
Planned maintenance at industrial park including groundworks, line marking and signage.