Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Liquid resin treatment
Liquid resin treatment to fascia and gutter
Electrical Repair of Entrance Control
Reactive maintenance to repair entrance control to office car park to ensure no security problems.
Installation of Protective Bollards
Planned maintenance work to install parking bollards to act as a safety barrier to prevent health and safety risk to pedestrians.
Painting of Hoarding Board
Painting of a security hoarding
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme
Replacement of Lighting in Car Park
Reactive maintenance to restore lighting in carpark in order ensure security and health and safety on compromised.