Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Installation of Microwave Sensors
Installation of microwave sensors on stairs.
Hazard Strips
Installation of hazard strips to ensure that health and safety issues don’t occur in plant room.
Health and Safety Inspections
It is important that all ladders are inspected on a regular basis.
Gate Reinstatement
Reinstatement of gate at industrial park.
Fire Doors
Installation and upgrade of fire doors.
Carpet Cleaning
Deep cleaning a carpet is often as effective as a replacement.