Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Repair of Pathways and Roads
Repair of pathways and roads at medical centre.
Solid Gate
Solid Gate installed at commercial building.
Gate Installation
Installation of security gate with vehicle and pedestrian access at commercial office building.
Bathroom Refurbishment
Refurbishment of commercial bathroom.
Gate Construction
Construction of pedestrian and vehicle gate at commercial building.
Refurbishment of Flat
Flat refurbishment including decorating - boxing in of flue and carpet cleaning.