Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Health and Safety Inspections
It is important that all ladders are inspected on a regular basis.
Gate Reinstatement
Reinstatement of gate at industrial park.
Fire Doors
Installation and upgrade of fire doors.
Carpet Cleaning
Deep cleaning a carpet is often as effective as a replacement.
Repair of Pathways and Roads
Repair of pathways and roads at medical centre.
Solid Gate
Solid Gate installed at commercial building.









