Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.
Relay of Carpet
Loose carpet can be a trip hazard and is easily corrected.
Installation of Bollards
Installing bollards to prevent damage to walls can reduce longer term costs.