Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Replacement Door Handle
Emergency replacement of door handle.
Emergency Glass Replacement
Emergency glass replacement for entrance door.
High Level Gutter Clearance with Spider Boom
Clearing high level gutters of a commercial office in order to prevent water ingress problems in the future using a C230 Spider Boom.
Fitting of solar reflective film
Fitting of solar reflective solar film to external windows of commercial building in order to reduce air conditioning requirements leading to substantial costs savings and increased building energy efficiency.
External Painting and Refurbishment of Commercial Offices
Large scale refurbishment of commercial offices in Kensington including - painting, window refurbishment and pointing.
Door Frame Repair
Quality carpentry and painting can make woodwork look just like new even after a break in.