Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS

RECENT JOBS

Bike Racks

Installation of bike racks at Richmond office - New bike racks installed so as the tenant could encourage cycling to work saving parking costs.

2022-02-14T18:49:41+02:00
Go to Top