Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Step Repair
Ensuring that all internal steps are in good order prevents Health and safety risks.
Clearing Roof
Clearing of debris from roof of commercial building preventing water ingress and damage.
Highlighting
Highlighting of potential hazards post a health and safety assessment.
Installation of New Glass Canopy
Installation of new glass canopy over commercial building entrance.
Glass Pane
Emergency replacement of cracked pane of glass at commercial building.









