A planned groundworks job to replace broken and loose gully slabs. Broken and loose gully slabs were lifted out and replaced or reset as required.

RECENT JOBS

  1. 1
  2. 2
  3. 3
  4. 4

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2022-02-14T18:54:02+02:00
Go to Top