A planned groundworks job to replace broken and loose gully slabs. Broken and loose gully slabs were lifted out and replaced or reset as required.
RECENT JOBS
Installation of Palisade fencing
Our planned maintenance team installed a palisade fence in order to prevent fly tipping at an industrial site.
Gutter Cleaning
Our planned preventative maintenance team attended in order to clear gutters on a business park.
Roof inspection and repair
Our commercial roofing team travelled to The Midlands to inspect and repair a roof suffering from water ingress.
Replacement of faulty lights
Our electrical team attended an emergency call out and replaced faulty lights.
Brickwork at retail centre
Our reactive maintenance team attended a retail centre in order to repair brickwork in response to a health and safety report.
Car park Lining
Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material to form markings.