Our preventative maintenance team installed hand sanitiser and signage (directional and instructional throughout a commercial premises to ensure that health and safety guidance relating to the corona was followed and the premises were COVID-19 SECURE .
RECENT JOBS
Installation of Gate
Fabrication and installation of new double leaf gate.
Pre-Christmas Refresh
Painting of bike racks and handrails ready for Christmas shopping at retail centre
Sign Clean
Cleaning of sign at entrance to industrial park.
Winter Preparations
In preparation for winter - drains cleared and over hanging trees branches cut back to prevent leaves falling into drains.
Emergency Repair
Emergency 2 hour repair to damaged height restrictor at Oxford retail park.
Bollard Repair
Repair of damaged raised bollard.









