Our team attended an industrial park where some steps had become a Health and Safety hazard. Lifted , cleaned and relaid the slabs on a new bed of mortar and painted step nosings.
RECENT JOBS
Fitting of Hand Dryer
Fitting of a new hand dryer in ladies tiles of office as part of a refurbishment.
Road Resurfacing
Road resurfacing at health club by digging out arisings laying concrete and then a top covering of tarmac.
Installation of ramp
Installation of ramp at office building as part of planned maintenance review following a heath and safety audit.
Installation of wooden fence replacement
Carpentry and security requirement - installing a wooden fence to prevent access to the site through a hedge by third parties.
Refurbishment
Refurbishment of central London office as part of a planned maintenance schedule. Decorating of walls and all wood.
LED Installation
Planned maintenance at an industrial trading site. Electrical installation to replace all existing light fittings with LED light fittings.